BEQ Parking Garage

BEQ-Parking-Garage-12
BEQ Parking Garage
P301 BEQ Parking Garage
Puget Sound Naval Shipyard
Bremerton, WA

This 3-level, 196-stall design-build parking garage serves the Bachelor’s Enlisted Quarters at the Puget Sound Naval Shipyard in Bremerton. Fraser/Fogle Architects and Reid Middleton teamed with Marpac to design the award-winning facility.

The project features a pedestrian bridge connecting the new garage to an adjacent building, a partial masonry facade, tensioned cable railings, steel stairs, and sustainable design elements. The garage structure consists of one level of slab on grade with two levels of post tensioned and conventionally reinforced slabs.

Construction involved demolition of an existing 2-story concrete building, earthwork, geopiers, landscaping, structural concrete, masonry, steel stairs and cable rails, painting, plumbing, and electrical.