Marpac Construction, LLC
About Us Project Profiles Contact Us Resources Home
 
 
 
   
Bremerton Naval Hospital
Bremerton, WA

Fuel Oil Tank replacement Project.

Client: U.S. Dept of the Navy
Navy Contact: LT Matthew Manskar
 
 
 
   
Bremerton Naval Hospital
Bremerton, WA

Exterior Cleaning & Caulking Project.

Client: U.S. Dept of the Navy
Army Corp of Engineers Contact: Evonne Hinson
 
 
 
   
Bremerton Naval Hospital
Bremerton, WA

Replace Domestic Waterlines.

Client: U.S. Dept of the Navy
Army Corp of Engineers Contact: Evonne Hinson
 
 
 
   
Manchester Naval Fuel Depot
Manchester, WA

Marine & industrial fuel system construction.

Client: Army Corps. of Engineers
Architect: Design/Build
 
 
 
   
Bremerton Hospital Seismic Retrofit (June 2007)
$4,280,000 (Lump Sum)

Seismic upgrades to the Bremerton Naval Hospital.

Client: US Dept of the Navy
John Wade (360) 396-1502

Architect: N/A
 
 
 
   
VA Hospital D&T Seismic Upgrades* (May 2007)
$4,300,000 (Lump Sum)

Seattle, WA

Seismic renovation of an occupied, muti-story hospital

Client: Puget Sound Health Care System
Ed Boogaerts (206) 764-2031

Architect: GLHN Architects and Engineers
David Grigsby (520) 881-4546

*Project is a joint venture with KICD Contruction
 
 
 
   
PSNS P-301 Parking Garage (December 2006)
$3,700,000 (Lump Sum)

Bremerton, WA

Demolition of two existing buildings and new construction of a two-story, 196-stall parking garage.

Client: U.S. Dept of the Navy

Structural Engineer: Reid Middleton
Brian Moon (425) 741-3800
 
 
 
   
Camp Grizzly Mock Prison (October 2006)
$70,000 (Negotiated Lump Sum)

Enumclaw, WA

Electrical installation, site leveling, & grading.

Client: US Army Corps of Engineers
*Project is a joint venture with KIC Development.
 
 
 
   
Mud Mountain Dam * (October 2006)
$424,000 (Negotiated Lump Sum)

Enumclaw, WA

20 feet of tunnel plugging.

Client: US Army Corps of Engineers
*Project is a joint venture with KIC Development.
 
 
 
   
Howard Hanson Dam* (September 2006)
$543,000 (Negotiated Lump Sum)

Enumclaw, WA

Tunnel bolts: 111 dowels, 15 feet deep.

Client: US Army Corps of Engineers
*Project is a joint venture with KIC Development.
 
 
 
   
Fort Lewis Dining Hall, Building 3281 & 3417 (May 2006)
$1,307,000 (Negotiated)

Fort Lewis, WA

Renovate and re-open two previously decommissioned dining facilities at Ft Lewis, WA. Work includes asbestos abatement, selective demo, rough carpentry, GWB, paint, ceramic tile and terrazzo flooring, acoustical ceilings, new kitchen equipment, HVAC, fire suppression, plumbing, and electrical.

Client: US Army Corps of Engineers

Architect: Design/Build
 
 
 
   
GSA FEMA Bothell
Seattle, WA

Water drainage system modifications to existing underground buildings. Site paving, dewatering pumps, and electrical conduits.

Client: FEMA

Architect: Design/Build
 
 
 
   
Bremerton Steam Line Repair - Pier B (July 2004)
$1,307,000 (Negotiated)

Bremerton, WA

Replacement of two existing vaults and miscellaneous asbestos abatement. Replacement of approximately 1400 linear feet of condensation line.

Client: U.S. Dept. of the Navy
Mark Bennett (360) 476-7982

 
 
 
   
Ops 467 Tower (March 2004)
$1,817,000 (Negotiated Design/Build)

Bremerton, WA

Construction of new office and Port Operations Tower above an existing 7 story building.

Client: U.S. Dept. of the Navy
Marcy McIntyre (360) 476-6960

Architect: Mulvanny G2 Architects
Dave Glassman (435) 463-2000
 
 
 
   
McChord Air Force Base Perimeter Security (August 2003)
$1,676,000 (Negotiated Design/Build)

Tacoma, WA

Construction perimeter concrete walls, masonry walls and steel fancing.

Client: U.S. Air Force
S-Sgt. Jennifer George (253) 982-5090

 
 
 
   
Puget Sound Naval Shipyard (Relocate Ocean Engineering) (May 2003)
$1,314,000 (Negotiated Lump Sum)

Bremerton, WA

Convert 7th floor of building 467 from warehouse to office space, 31,000 SF tenant improvement.

Client: U.S. Dept. of the Navy
Don Ryan (360) 627-5071

 
 
 
   
GSA Federal Center South - Seismic Upgrade (2003)
$1,896,813 (Negotiated Lump Sum)

Seattle, WA

Convert 7th floor of building 467 from warehouse to office space, 31,000 SF tenant improvement.

Client: General Services Administration
Mike Rudder (253) 931-7295

Architect: ABS Consulting
Dan Symonds (206) 442-0670
 
 
 
   
Puget Sound Naval Shipyard (Renovate Building BEQ - 865) (November 2002)
$2,035,000 (Negotiated Lump Sum)

Bremerton, WA

Renovation of Bachelor Enlisted Quarters, Project includes all new interior finishes, new fire sprinkler system and upgrade HVAC.

Client: U.S. Dept. of the Navy
Marcy McIntire (360) 476-6960

 
 
 
   
Manchester Naval Duel Depot (Demolition of Pipes at Buildings 12 & 178) (June 2002)
$267, 908 (Negotiated)

Manchester, WA

Demolition of various piping in buildings 12 and 178.

Client: Army Corps. of Engineers
Sue Morgan (206) 764-6756

 
 
 
   
Manchester Naval Duel Depot (Pave Roads & Bern Slopes) (June 2002)
$344, 802 (Negotiated)

Manchester, WA

Asphalt paving of roads through out the Fuel Depot and providing berms to create a containment measure around various fuel tanks.

Client: Army Corps. of Engineers
Sue Morgan (206) 764-6756

 
 
 
   
Naval Counsel Offices at Bremerton Naval Station (March 2002)
$279,691 (Negotiated)

Bremerton, WA

Construct new Office of Counsel offices on the second floor. Demolish walls and carpeting of the existing first floor Office of Counsel offices. Renovate first floor area for new occupancy. Repair cracked areas throughout Building 467.

Client: Army Corps. of Engineers
Sue Morgan (206) 764-6756

 
 
 
   
Manchester Naval Fuel Depot (Replace Valves on the Fire Water Main) (February 2002)
$261, 691 (Negotiated)

Bremerton, WA

Replacement of water valves and vaults for the fire water main at Manchester Naval Duel Depot.

Client: Army Corps. of Engineers
Sue Morgan (206) 764-6756

 
 
 
 


©Copyright 2009 Marpac Construction, LLC. All Rights Reserved.