| Bremerton Hospital Seismic Retrofit (June 2007) $4,280,000 (Lump Sum) |
||
![]() |
Seismic upgrades to the Bremerton Naval Hospital. Client: US Dept of the Navy Architect : N/A |
|
| VA Hospital D&T Seismic Upgrades* (May 2007) $4,300,000 (Lump Sum) |
||
Seattle, WA |
Seismic renovation of an occupied, muti-story hospital Client: Puget Sound Health Care System Architect : GLHN Architects and Engineers *Project is a joint venture with KICD Contruction |
|
PSNS P-301 Parking Garage (December 2006) |
||
Bremerton, WA
|
Demolition of two existing buildings and new construction of a two-story, 196-stall parking garage. Client: U.S. Dept of the Navy Structural Engineer : Reid Middleton |
|
| Camp Grizzly Mock Prison (October 2006) $70,000 (Negotiated Lump Sum) |
||
Enumclaw, WA
|
Electrical installation, site leveling, & grading. Client: US Army Corps of Engineers *Project is a joint venture with KIC Development. |
|
| Mud Mountain Dam * (October 2006) $424,000 (Negotiated Lump Sum) |
||
Enumclaw, WA
|
20 feet of tunnel plugging. Client: US Army Corps of Engineers *Project is a joint venture with KIC Development. |
|
| Howard Hanson Dam* (September 2006) $543,000 (Negotiated Lump Sum) |
||
Enumclaw, WA
|
Tunnel bolts: 111 dowels, 15 feet deep. Client: US Army Corps of Engineers *Project is a joint venture with KIC Development. |
|
| Fort Lewis Dining Hall, Building 3281 & 3417 (May 2006) $1,307,000 (Negotiated) |
||
| Fort Lewis, WA | Renovate and re-open two previously decommissioned dining facilities at Ft Lewis, WA. Work includes asbestos abatement, selective demo, rough carpentry, GWB, paint, ceramic tile and terrazzo flooring, acoustical ceilings, new kitchen equipment, HVAC, fire suppression, plumbing, and electrical.
Client: US Army Corps of Engineers
Architect: Design/Build |
|
| GSA FEMA Bothell | ||
| Seattle, WA |
Water drainage system modifications to existing underground buildings. Site paving, dewatering pumps, and electrical conduits.
Client: FEMA
Architect: Design/Build |
|
| Bremerton Steam Line Repair - Pier B (July 2004) $1,307,000 (Negotiated) |
||
Bremerton, WA![]() |
Replacement of two existing vaults and miscellaneous asbestos abatement. Replacement of approximately 1400 linear feet of condensation line. Client: U.S. Dept. of the Navy |
|
Ops 467 Tower (March 2004) |
||
Bremerton, WA![]() |
Construction of new office and Port Operations Tower above an existing 7 story building. Client: U.S. Dept. of the Navy |
|
McChord Air Force Base Perimeter Security (August 2003) |
||
Tacoma, WA![]() |
Construction perimeter concrete walls, masonry walls and steel fancing. Client: U.S. Air Force |
|
| Puget Sound Naval Shipyard (Relocate Ocean Engineering) (May 2003) $1,314,000 (Negotiated Lump Sum |
||
Bremerton, WA![]() |
Convert 7th floor of building 467 from warehouse to office space, 31,000 SF tenant improvement. Client: U.S. Dept. of the Navy |
|
| GSA Federal Center South - Seismic Upgrade (2003) $1,896,813 (Negotiated Lump Sum) |
||
| Seattle, WA | Convert 7th floor of building 467 from warehouse to office space, 31,000 SF tenant improvement. Client: General Services Administration |
|
| Puget Sound Naval Shipyard (Renovate Building BEQ - 865) (November 2002) $2,035,000 (Negotiated Lump Sum) |
||
Bremerton, WA![]() |
Renovation of Bachelor Enlisted Quarters, Project includes all new interior finishes, new fire sprinkler system and upgrade HVAC. Client: U.S. Dept. of the Navy |
|
| Manchester Naval Duel Depot (Demolition of Pipes at Buildings 12 & 178) (June 2002) $267, 908 (Negotiated) |
||
Manchester, WA![]() |
Demolition of various piping in buildings 12 and 178. Client: Army Corps. of Engineers |
|
| Manchester Naval Duel Depot (Pave Roads & Bern Slopes) (June 2002) $344, 802 (Negotiated) |
||
Manchester, WA![]() |
Asphalt paving of roads through out the Fuel Depot and providing berms to create a containment measure around various fuel tanks. Client: Army Corps. of Engineers |
|
| Naval Counsel Offices at Bremerton Naval Station (March 2002) $279,691 (Negotiated) |
||
Bremerton, WA![]() |
Construct new Office of Counsel offices on the second floor. Demolish walls and carpeting of the existing first floor Office of Counsel offices. Renovate first floor area for new occupancy. Repair cracked areas throughout Building 467. Client: Army Corps. of Engineers |
|
| Manchester Naval Fuel Depot (Replace Valves on the Fire Water Main) (February 2002) $261, 691 (Negotiated) |
||
Bremerton, WA![]() |
Replacement of water valves and vaults for the fire water main at Manchester Naval Duel Depot. Client: Army Corps. of Engineers |
|
| Oswald Hall HVAC (2000) $221,894 (Negotiated) |
||
Seattle, WA![]() |
Demolition of boiler and installation of new HVAC system complete with new controls. Client: Army Corps. of Engineers |
|
| Ft. Lewis Metal Bldg. (2000) $435,578 (Negotiated Design/Build) |
||
Tacoma, WA![]() |
Installation of a pre-engineered metal building, with an insulated standing seam metal roof, installation of accessories required for gas, water, sewer, computers. Client: Army Corps. of Engineers |
|
| Mud Mountain Dam Warehouse (2000) $190,000 (Negotiated Design/Build) |
||
Seattle, WA![]() |
Design & installation of new HVAC system tenant improvements. Client: Army Corps. of Engineers |
|
| Jackson Park Family Housing Renovation (2000) $2,500,000 (Negotiated) |
||
Kitsap County, WA![]() |
Window and door replacements in 300 FY75 housing units. Client: Department of the Navy |
|
| Mud Mountain Dam Phase I and II (2000) $5,584,000 (Two Negotiated Contracts) |
||
Kitsap County, WA![]() |
Demolition of concrete and installation of steer liner material with anchoring system for the 23-foot chamber and tunnel approximately one-quarter mile in length. Client: Army Corps. of Engineers |
|
| Harvey Hall HVAC (2000) $136,142 (Design/Build) |
||
Tacoma, WA![]() |
Upgrade heating system. Client: Army Corps. of Engineers |
|
| Manchester T.O. #3 (2000) $136,889 (Negotiated Design/Build) |
||
Manchester, WA![]() |
Replacement of 10'' fire water pipelines. Client: Army Corps. of Engineers |
|
| Manchester T.O. #17 (2000) $151,706 (Negotiated Design/Build) |
||
Manchester, WA![]() |
Refurbish 50,000 gallon day tank and 6 filter tanks. Client: Army Corps. of Engineers |
|
| Manchester T.O. #15 (2000) $33,958 (Negotiated Design/Build) |
||
Manchester, WA![]() |
Provide natural gas line to building 194 and convert oil boiler to natural gas. Client: Army Corps. of Engineers |
|
| Manchester T.O. #16 (2000) $519, 064 (Negotiated Design/Build) |
||
Manchester, WA![]() |
Replace truck fill equipment at 3 stations plus misc. mechanical/electrical work at various other fuel loading stations. Client: Army Corps. of Engineers |
|
St. Martin de Porres Homeless Shelter (2000)
$318,632 (Design/Build) |
||
Seattle, WA![]() |
Utility improvements. Convert steam heating hydronic heating system with new controls. Separate electrical from adjacent tenant. Build new storage room. Client: Army Corps. of Engineers |
|
| Mud Mountain Dam Office HVAC (1999) $109,330 (Design/Build) |
||
King County, WA![]() |
Installation of new complete HVAC system with new DDC contols. Client: Army Corps. of Engineers |
|
| Bangor Housing Improvements (1999) $109,330 (Negotiated Lump Sum) |
||
Bangor, WA![]() |
Replacement of all windows, sliding glass doors, electric baseboard heaters and associated thermostats, and electric water heaters, 262 units. Client: NAVFACECOM |
|
| Tumwater HVAC (1999) $270,013 (Negotiated Design/Build) |
||
Tumwater, WA![]() |
Demolition of boiler and installation of new HVAC system complete with new controls. Asbestos abatement and tenant improvements. Client: NAVFACECOM |
|
| Manchester T.O #4 (1999) $20,557 (Negotiated) |
||
Manchester, WA![]() |
Building break-room, restrooms upgrade and other tenant improvements. Client: Army Corps. of Engineers |
|
| Manchester T.O #8 (1999) $66,000 (Negotiated) |
||
Manchester, WA![]() |
Installation of valves at tanks 16-21. Client: Army Corps. of Engineers |
|
| Manchester T.O #6 (1998) $281,997 (Negotiated) |
||
Manchester, WA![]() |
Miscellaneous improvements to docking facilities. Client: Army Corps. of Engineers |
|
| Fuel Loading and Ventilation (1998) $286,890 (Negotiated) |
||
Manchester, WA![]() |
Renovation of the JP-8 fuel loading arm, install ventilation in 23 value put laterals, renovation of the ventilation system in the Oily Waste building. Client: Army Corps. of Engineers |
|
| Expand Border Patrol Station (1998) $396,016 (Negotiated Design/Build) |
||
Bellingham, WA![]() |
New construction of a 24' x 80' parking structure to match existing architecture. Renovation and expansion of the existing building at Bellingham INS. Client: Army Corps. of Engineers |
|
| McChord Force Protection (1998) $1,960,000 (Negotiated) |
||
Tacoma, WA![]() |
Security upgrades for facility including concrete barriers, fencing and security electronics. Client: Army Corps. of Engineers |
|
| Various Structure & Site Drainage (1998) $232,615 (Negotiated) |
||
Manchester, WA![]() |
Repair drain system 10 valve pits, including concrete slabs on the valve it floors & installing a new drain system. Client: Army Corps. of Engineers |
|
| Mud Mountain Dam (1998) $722,210 (Negotiated) |
||
King County , WA![]() |
Demolition of concrete and installation of steel plate liner with anchoring system to a 9' diameter entrance chamber and tunnel. Client: Army Corps. of Engineers |
|
| VA Cable Tray (1998) $254,000 (Negotiated) |
||
Seattle, WA![]() |
Install cable to facilitate existing low voltage computer system. Client: VA Puget Sound Health Care System |
|
| Tunnel & Joint Seal Repair & Seal (1997) $489,920 (Negotiated) |
||
Manchester, WA![]() |
Clean and seal approximately 1,361 LF joint and cracks in existing tunnels in approx. 2 miles of underground tunnels for the pipe lines supplying 42 underground fuel storage tanks. Client: Army Corps. of Engineers |
|
| Safe Access Platforms & Remove Fuel (1997) $238,316 (Negotiated) |
||
Manchester, WA![]() |
Marine construction to provide installation of rub nails dolphin ramps, safe access platforms over 2 valve pits, removal of (6) 16'' pipe line flanges for the main pier. Client: Army Corps. of Engineers |
|
| Guard House & Mask Testing Facility (1997) $529,949 (Negotiated) |
||
Umatilla, WA![]() |
New construction of mask testing facility. Client: Army Corps. of Engineers |
|
| Asbestos Abatement & Misc. Remodeling (1997) $483,000 (Negotiated) |
||
Oregon and Washington ![]() |
3 site locations. Removed all asbestos pipe insulation and re-insulate. Work included plaster patching, gypsum wall board, painting, & acoustical ceilings. Client: Army Corps. of Engineers |
|
| Containment Booms & Can Dock Repair (1997) $205,500 (Negotiated) |
||
Manchester, WA![]() |
Marine construction including permanent and deployable containment blooms. Replace failing hardware, install tire bumpers, spring plate ramps, and chain assembly on can dock. Client: Army Corps. of Engineers |
|
| Repair Failed Telephone System (1997) $181,500 (Negotiated) |
||
Fort Lawton , WA![]() |
Install a new 600-line communication system for Block 500, Ft. Lawton. Involved new power poles, terminal. Client: Army Corps. of Engineers |
|
| VA Energy Conservation Measures (1997) $442,000 (Negotiated) |
||
Seattle, WA![]() |
Medical air and vacuum mechanical systems upgrade. Client: Army Corps. of Engineers |
|
![]()